MONTH IN FM TO ADVERTISE IN MONTH IN FM PLEASE CONTACT
DANNY.GRANGE@KPMMEDIA.CO.UK OR CALL 01322 476811
56 MAY 2019
FLOTEX COLOUR: SMART. INNOVATIVE.
COLOURFUL.
Forbo Flooring Systems has refreshed its Flotex Colour collection with the
addition of a new design and format, as well as an array of new colours that
are inspired by the moods and
illuminating and spectral shades
of cities around the world. The
comprehensive flocked flooring
range now o ers even more
flexibility to create contemporary
interiors.
There is no denying that certain
cities have their own mood and
identity, whether it’s the bright
neon hues of Tokyo or the darker,
more gritty shades of New York;
every city has its own unique colour
palette, which may be so subtle that perception di ers from person to person.
From so er, tone-on-tone shades to rich and vibrant hues, the hues found in the
rejuvenated Flotex Colour collection have been inspired by the wide choice of
colour found in cities and urban landscapes.
Comprising subtle tones and pared back hues taken from the surfaces of
urban builds to vibrant colour pops inspired by city lights, the collection o ers
a whole spectrum of 96 shades and 5 unique designs to choose from; Metro,
Penang, Calgary, Savannah and new to 2019, Canyon. What’s more, 36 colours
of this versatile collection are now also available in a plank format, as well as
current sheet and tile options. Savannah comes in six colourways and is only
available in plank format.
www.forbo-flooring.co.uk/flotexcolour
RINNAI HOT WATER UNITS NOW WITH
COMPLETE SERVICE PLANS TO ENSURE A
CONTINUOUS FLOW
Rinnai, the UK leader in the supply of energy
e icient hot water heating units for the facilities
industry, is introducing comprehensive service
plans for all new and existing sites with proof of
service to ensure that users have a continuous
flow of temperature accurate hot water. The
Rinnai Service Plans start from as little as £25 per
month.
Continuous flows of hot water are vital to the
facilities sector as any break in hot water flow
can have serious repercussions for any size of
business.
The Rinnai Service Plans include:
Annual Service - to ensure that the hot water
heating system is working at maximum e iciency.
This will ensure lower costs and a longer working life from the Rinnai appliance.
A “Call Out Service” in the unlikely event of a breakdown where an engineer
maybe required, we will arrange to get a trained engineer to site as soon as
possible. System Inspection - to ensure safety and full compliance to all current
legislation.
Says Rinnai Operations Director Chris Goggin, (BSc, M:ent, PGDipM) “We are
o ering our facilities customers Service Plans for their peace of mind in knowing
that, in the unlikely event of a problem, they have an instant answer to the
problem.”
www.rinnaiuk.com
OUR FOCUS ON FIRE SAFETY &
INDOOR AIR QUALITY
All Clean (Worcester) Ltd. has over 25 years of experience in providing high
quality services to the facilities management sector. Our extensive experience
and knowledge gives us the confidence to perform our tasks to the highest
possible standards. We specialise, but are not limited to, the maintenance of fire
and smoke dampers and cleaning of ventilation systems.
Services we provide:
Fire & Smoke Damper Inspection.
Swab Testing for Yeast & Microbiological Organisms.
Ductwork Cleaning.
Kitchen Deep Cleaning.
Kitchen Extract Cleaning.
CAD Drawings.
Damper Repairs.
All our technicians are CITB NI qualified. Fire damper inspections are carried
out in accordance with BS9999. All work is carried out to BS15780, EC852/2004
and TR19 guidelines. All our sampling procedures are independently verified
by South West Water, a UKAS accredited laboratory. All Clean (Worcester) Ltd.
is a member of NAAD UK.
Please contact us to find out how
we can help you with your needs.
www.allclean.co.uk
sales@allclean.co.uk
01905 726727
OFFICE PRINCIPLES PROVIDES AGILE SPACE
FOR CORNERSTONE
O ice Principles has designed and delivered a complete new agile working
model for Cornerstone, the UK’s leading infrastructure services company, in its
move from a 38,000 sq space to 22, 000 sq , with a seven to ten desk sharing
ratio, to make more e icient use
of the new space, drive higher
performance and increase sta
engagement.
The fast-track fit out process
was completed in approximately
11 weeks and included
carpets, partitioning, ceilings,
kitchen, extra shower and feet
washing facilities, all decor and
the creation of a dedicated
wellbeing room.
Work on the project followed a workplace study, conducted by O ice
Principles, which included a utilization study and a sta engagement process, to
give Cornerstone a thorough understanding of how it could change its culture
and working practises to increase greater teamwork and collaboration, while
reducing its occupied space.
Ginette Kilroy, People Director for Cornerstone is excited by the game-changing
position that the completed project has brought the company to: “This has
provided us with a cultural shi and whole new dynamic. We wanted this new
o ice project to, essentially, be about the people and, with O ice Principles’
consultancy and support, we have secured an inspirational working space that
will accommodate fluid team working and client engagement.”
www.o iceprinciples.com
link
/flotexcolour
/www.rinnaiuk.com
/www.allclean.co.uk
link
/www.officeprinciples.com