Home / Building Design / Technical guidance aims to improve spatial awareness in building services

Technical guidance aims to improve spatial awareness in building services

New technical guidance from the Building Engineering Services Association (BESA) emphasises the importance of allowing adequate spacing between building services in projects using traditional approaches, modern methods of construction (MMC) and design for manufacture and assembly (DfMA).

BESA Technical Bulletin (TB56/1.1) is the first in a series planned by the Association’s specialist Offsite Group and provides a snapshot of guidelines, principles, and rules of thumb to be considered as early as possible in the design process for the spatial fit of services.

It illustrates the importance of making sure the spatial provision of services, particularly key elements like ceiling void depths, distribution routes, access and maintenance zones are validated and accurate by the end of RIBA Stage 3 as the building form and fabric will be largely set by that point.

The free guidance explains how designers and engineers should ensure that pinch points and spatial consideration are a consideration for all “rooms, routes and risers” (the three R’s). It also gives project teams valuable rules of thumb for ensuring proper separation of services, spare capacity, and future service zones to allow for any potential changes during the lifetime of the building.

BESA Offsite Group chair Mark Snell commented: “This technical bulletin is a great example of the collaboration between BESA, the industry’s leading MMC and DfMA manufacturers, and delivery companies. It is encouraging that all the parties were keen to share their combined knowledge and experience with the wider industry.

“Spatial fit has long been an area of concern that, unless considered at the earliest stages, can lead to multiple problems down the line and restrict our ability to achieve co-ordination of works at RIBA stage 4 and beyond. It can also leave end clients with a potentially expensive problem if they want to make changes to the building in the future.”

The technical bulletin is free to download and refers to relevant industry guidance including BESA publications DW144 and TR19.

Metro Rod Drainage and Plumbing Survey

With the current economic crisis resulting in higher prices and more of a squeeze on resources, FMs need to ensure that they have robust building and maintenance services in place to control costs and reduce the need for emergency repairs. When it comes to drainage and plumbing there are also the challenges of dealing with extreme weather, from droughts to flooding, the need to meet stringent regulations and to avoid causing environmental damage.

UK drainage specialist, Metro Rod, has launched a survey which explores the main areas of interest for FMs in maintaining drainage and plumbing, including how they currently assess their supply chains to ensure they’re working with partners that meet the highest possible standards and provide value for money.

The results will be published online so that you can see how you compare to others within the sector.

The survey should take just 5-10 minutes of your time, and as a thank you, you will be entered into a prize draw, where one lucky winner will be picked at random to receive a £100 Amazon voucher.

To take part click here.

 

About Sarah OBeirne

Leave a Reply

Your email address will not be published. Required fields are marked *

*