Working directly with Nottingham University, TORMAX recently completed a new automatic entrance into the David Ross Sports Village. This popular facility experiences high levels of pedestrian traffic so TORMAX recommended their robust, technologically advanced iMotion 2202.A door drives to automate ...
Read More »Glass entrance lobby creates automatic entrance to Oxford Chapel
Working with commercial glazing specialists IQ Projects, TORMAX has delivered discrete and reliable automation to a new draught lobby installed inside the main entrance to the 13th century chapel at Merton College, Oxford. Successfully reducing heat loss from the building ...
Read More »Access upgrade for Mill Gate shoppers
Aiming to improve accessibility, the Mill Gate shopping centre in Bury is currently replacing many of the automatic entrances with technologically advanced TORMAX operators, improving functionality and standardising systems. For example, a recent installation was to the carpark corridor entrance ...
Read More »Quick access for Slick Stitch staff
Improving both security and accessibility, TORMAX was recently contracted to remove two manual doors at the Slick Stitch head offices and replace them with new, single sliding automatic entrance systems. Contained in a compact casing that measures just 100mm high, ...
Read More »